Skip to content

All best practices

CS-040mixed

The Boeing Company

787 Dreamliner global partner supply chain (launch 2004 to first delivery 2011)

Region
North America, East Asia, Western Europe, Global
Country
United States, Japan, Italy
Industry
Aerospace and Defence (Discrete Manufacturing)
Functions
Supply Chain & Logistics, Procurement & Strategic Sourcing, Manufacturing & Production, Product, R&D & Innovation, Strategy, Corporate Development & Transformation Office
Topics
Supply chain disruption has made the network fragile; Operations cannot meet demand efficiently; Quality, scrap, defects and rework are out of control; Innovation is too slow to defend competitiveness; Investment capital is not generating returns
Starting situation
New initiative
Period
2004–2011
Last verified
1 November 2026

Executive summary

Boeing launched the 787 in April 2004 with a 50-aircraft order from ANA and a promise of 2008 deliveries [C01]. It built the aircraft through a small number of large partners that designed as well as built major structures — Japanese companies co-designing 35% of the aircraft, Alenia, Vought and Spirit building fuselage sections — with partners and their governments sharing development cost [C04, C05, C06, C07].

The model met fastener shortages, unfinished work arriving at final assembly, a buckled wing box, a delaminating wing-body join and a strike [C10, C12, C13]. First delivery slipped from 2008 to September 2011 [C01, C24]. Boeing bought two partner operations in South Carolina [C14, C20].

The three numbers that matter: more than three years of delay to first delivery [C01, C24]; US$2.7bn of costs for three unsellable test aircraft moved to R&D [C18]; and US$9.7bn of deferred production costs for about 40 aircraft by October 2011 [C27]. Against these, the 787 held 860 firm orders at the end of 2011 [C25].

The one lesson (KB inference): you can outsource work, but not integration or responsibility; when partners design as well as build, the prime contractor still needs the engineering depth to specify, oversee and fix what they deliver [C08, C21, C29].

Outcome: mixed

Documented shortfalls or reversals sit alongside documented gains. For example: an initial failure later recovered, or a strategic goal met while a major adverse event in the same programme was recorded.

Basis of the outcome

The 787 entered service with launch customer ANA in September 2011 and held 860 cumulative firm orders at the end of 2011, and Boeing set a 1,100-aircraft accounting block. But first delivery came more than three years after the 2008 date announced at launch; Boeing moved US$2.7bn of costs for three unsellable flight-test aircraft to R&D, carried about US$9.7bn of deferred production costs in late 2011, recorded low margins on its first deliveries, and bought two partner operations in South Carolina that built or joined 787 fuselage sections.

Key figures

PhaseFigureValueWhenVerification
BeforeLaunch orderANA, 50 aircraft, about US$6bn listApr 2004company_reported
BeforePlanned first delivery2008Apr 2004company_reported
BeforeShare built and co-designed by three Japanese partners35%2007press_reported
BeforeJapanese government loans to partners (estimate)up to US$2bn2007press_reported
DuringFirst-delivery slip announcedMay 2008 to late Nov/Dec 2008Oct 2007press_reported
DuringVought North Charleston purchaseabout US$580m cash (about US$1bn incl. forgiveness, per Aboulafia)Jul 2009regulatory_filing_unaudited
DuringTest aircraft costs moved to R&DUS$2,693m2009audited_filing
DuringFirst flight delay28 monthsDec 2009press_reported
DuringGlobal AeronauticaBoeing becomes sole ownerDec 2009company_reported
AfterFirst delivery26 Sep 20112011company_reported
AfterCumulative firm orders860end-2011regulatory_filing_unaudited
AfterDeferred production balanceUS$9.7bn for about 40 aircraftOct 2011press_reported
AfterAccounting block / margin1,100 aircraft / low single digits2011regulatory_filing_unaudited
company_reported
A company statement, press release or investor presentation that no one has independently checked.
press_reported
A journalist's own reporting.
regulatory_filing_unaudited
Text in an 8-K, 6-K or 10-Q, which is filed with a regulator but not audited.
audited_filing
A figure in audited financial statements, such as an annual report's financial statements or a 10-K.

Sources

  1. S01 Boeing Launches 7E7 Dreamliner · Boeing, Boeing, 2004-04-26 · accessed 2026-11-01
  2. S02 Boeing buzzes about 'source' of work · Dominic Gates, The Seattle Times, 2003-03-09 · accessed 2026-11-01
  3. S03 Boeing shares work, but guards its secrets · Dominic Gates, The Seattle Times, 2007-05-15 · accessed 2026-11-01
  4. S04 Boeing Confirms 787 Delay, Fasteners, Flight Control Software Code Blamed · not stated, Design News, 2007-09-05 · accessed 2026-11-01
  5. S05 Boeing delays 787 deliveries by six months · Mary Kirby, Flight International (FlightGlobal), 2007-10-10 · accessed 2026-11-01
  6. S06 Boeing Schedules 787 Dreamliner First Flight for Second Quarter 2009, First Delivery for First Quarter 2010 · Boeing, Boeing, 2008-12-11 · accessed 2026-11-01
  7. S07 Boeing Form 8-K, Exhibit 99.1: Boeing to acquire Vought's 787 operations in North Charleston · Boeing, Boeing / US SEC, 2009-07-07 · accessed 2026-11-01
  8. S08 July 2009 Letter · Richard Aboulafia, Richard Aboulafia (AeroDynamic Advisory; then Teal Group), 2009-07-11 · accessed 2026-11-01
  9. S09 Boeing Announces New 787 Schedule and Third-Quarter Charge · Boeing, Boeing, 2009-08-27 · accessed 2026-11-01
  10. S10 Boeing Acquires Alenia North America's Interest in Global Aeronautica · Boeing, Boeing, 2009-12-22 · accessed 2026-11-01
  11. S11 The Boeing Company Form 10-K for 2009 · Boeing, Boeing / US SEC, 2010-02 · accessed 2026-11-01
  12. S12 Reinventing the Commercial Jet · David Talbot, MIT Technology Review, 2010-02-23 · accessed 2026-11-01
  13. S13 Mixed Messages from Boeing CEO · IAM, International Association of Machinists and Aerospace Workers (IAM), 2010-03-04 · accessed 2026-11-01
  14. S14 Boeing chief: Outsourcing strategy was a mistake · not stated, Assembly Magazine, 2011-02-24 · accessed 2026-11-01
  15. S15 Boeing, ANA Celebrate First 787 Dreamliner Delivery · Boeing, Boeing, 2011-09-26 · accessed 2026-11-01
  16. S16 Boeing sets 787 accounting block at 1,100; earnings call summary · Scott Hamilton, Leeham News, 2011-10-26 · accessed 2026-11-01
  17. S17 The Boeing Company Form 10-K for 2011 · Boeing, Boeing / US SEC, 2012-02 · accessed 2026-11-01
  18. S18 Is Outsourcing Really to Blame for the Dreamliner Fiasco? Our Faculty Discusses · Jessica Love, Kellogg Insight (Northwestern University), 2013-01-23 · accessed 2026-11-01
  19. S19 Boeing 787's problems blamed on outsourcing, lack of oversight · Dominic Gates, The Seattle Times, 2013 (inferred) · accessed 2026-11-01

Researched and fact-checked knowledgebase · Knowledgebase built 5 November 2026 · Last verified 1 November 2026