CS-065mixed

Airbus (EADS)

Power8 restructuring programme and Power8 Plus (2007–2010, extended to 2012)

Region
Western Europe
Country
France, Germany, United Kingdom, Spain
Industry
Aerospace and Defence (Discrete Manufacturing)
Functions
Strategy, Corporate Development & Transformation Office, Manufacturing & Production, Procurement & Strategic Sourcing, Supply Chain & Logistics, Product, R&D & Innovation, HR & Workforce
Topics
Margins are eroding despite revenue; Cash is trapped and liquidity is tightening; Bureaucracy and slow decisions prevent agility; M&A integration or corporate complexity is destroying value; Supplier inflation and procurement leakage are unsustainable; Innovation is too slow to defend competitiveness
Starting situation
Stalled or failing (turnaround)
Period
2007–2010
Last verified
1 November 2026

Executive summary

In February 2007 Airbus launched Power8, a restructuring to deliver €2.1bn a year of EBIT contribution from 2010 and €5bn of extra cash in 2007–2010, cut 10,000 positions and open six European plants to partners or buyers [C07, C08, C10]. It followed A380 delays costing an expected €4.8bn of EBIT and a 2006 operating loss at Airbus [C01, C13].

The three numbers that matter: the €2.1bn annual target [C07]; about 5,000 positions reduced by end-2008 [C18]; and €2bn of gross savings reported by end-2009, which EADS said differs from the net EBIT effect [C21].

Outcome: classed mixed. EADS reported the savings largely delivered and returned to net profit in 2010 [C21, C22]. But the plan to sell or hand over plants largely failed — only Filton and Laupheim were sold, and five units stayed inside EADS — and the programme was extended to 2012 under 'Power8 Plus' [C16, C17, C19].

The one lesson, as the KB reads it: a cost programme cannot fix a governance structure that slows every decision; the French Senate found the two-headed structure itself was part of the problem [C04, C05].

Outcome: mixed

Documented shortfalls or reversals sit alongside documented gains. For example: an initial failure later recovered, or a strategic goal met while a major adverse event in the same programme was recorded.

Basis of the outcome

Documented gains: €2bn of gross Power8 savings by end-2009 (S17), about 5,000 positions reduced by end-2008 (S14), two plant sales and the aerostructures reorganisation completed (S15, S16), and a return to net profit in 2010 (S18) — all company-reported. Documented shortfalls: the plan to open six sites to partners or buyers largely failed, with five units kept in EADS-owned subsidiaries after bidders withdrew (S12, S15), and the programme was extended from 2010 to 2012 under Power8 Plus (S13). Under the outcome criteria the class is mixed. The programme's own shortfalls remain at the end of the period: the structural module meant to open six sites to partners or buyers ended with two sales and five units kept inside EADS, and the end date moved by two years. The A380 and A400M charges are excluded from the basis, because no source links them to Power8.

Key figures

PhaseFigureValueWhenVerification
BeforeExpected A380 EBIT hit€4.8bn to 2010Oct 2006press_reported
BeforeAirbus EBIT−€572m; EADS net profit €99m2006press_reported
BeforeCabling to rework (first 26 A380s)≈530 km2006–2007official_finding
BeforePower8 targets€2.1bn EBIT a year from 2010; €5bn cash 2007–1028 Feb 2007company_reported
BeforePositions to cut10,000 (5,000 direct, 5,000 contractors)28 Feb 2007company_reported
BeforeRestructuring provision€680mQ1 2007company_reported
DuringPower8 savings (2007)€300m minimum met; ≈€500mFeb–Jul 2008press_reported
DuringPositions reduced≈5,000 (56% internal)end-2008company_reported
DuringPower8 Plus+€650m; programme extended to 2012Sep 2008press_reported
DuringFilton sale to GKN£136m5 Jan 2009press_reported
AfterGross Power8 savings€2bnend-2009company_reported
AfterEADS net result−€763m (2009); €553m (2010)2009–2010company_reported
AfterEADS employees119,506 (2009); 121,691 (2010)2009–2010company_reported
press_reported
A journalist's own reporting.
official_finding
A finding of an inquiry, court or regulator.
company_reported
A company statement, press release or investor presentation that no one has independently checked.

Sources

  1. S01 Power8 prepares way for 'new Airbus' · Airbus, Airbus, 2007-02-28 · accessed 2026-11-01
  2. S02 EADS : conforter le champion européen — Deuxième partie, I : le plan de redressement Power 8 · Jean-François Le Grand and Roland Ries (rapporteurs), Sénat (France), Commission des affaires économiques, 2007-06-27 · accessed 2026-11-01
  3. S03 EADS : conforter le champion européen — l'aggravation des difficultés techniques du programme A380 par le manque d'intégration et de management cohérent · Jean-François Le Grand and Roland Ries (rapporteurs), Sénat (France), Commission des affaires économiques, 2007-06-27 · accessed 2026-11-01
  4. S04 EADS : conforter le champion européen — B. La gouvernance actuelle : des difficultés croissantes · Jean-François Le Grand and Roland Ries (rapporteurs), Sénat (France), Commission des affaires économiques, 2007-06-27 · accessed 2026-11-01
  5. S05 EADS verschiebt A380 um ein Jahr – 4,8 Mrd Euro Belastung · not stated, Moneycab, 2006-10-04 · accessed 2026-11-01
  6. S06 Airbus gets new chief executive · not stated, Al Jazeera, 2006-10-09 · accessed 2026-11-01
  7. S07 Airbus to modify turnaround plan · not stated, CNBC, 2007-02-20 (from URL) · accessed 2026-11-01
  8. S08 Airbus announces massive job cuts · Staff Reporter (AFP), Mail & Guardian (AFP), 2007-02-28 · accessed 2026-11-01
  9. S09 EADS struggles with Airbus losses · Helen Massy-Beresford, Flight International, 2007-03-13 · accessed 2026-11-01
  10. S10 Airbus: internal restructuring (Germany), factsheet 64283 · not stated, Eurofound, European Restructuring Monitor, 2007 (event announced 18 Oct 2006; entries to Oct 2007) · accessed 2026-11-01
  11. S11 Airbus plans more cost cutting beyond Power8 · not stated, Aviation International News, 2008-02-17 · accessed 2026-11-01
  12. S12 EADS undeterred by failure to divest Airbus plants · Gregory Polek, Aviation International News, 2008-07-02 · accessed 2026-11-01
  13. S13 Airbus unveils Power8 Plus · Gregory Polek, Aviation International News, 2008-09-09 · accessed 2026-11-01
  14. S14 EADS full year 2008 results (presentation) · EADS, EADS (archived by Airbus), 2009-03 · accessed 2026-11-01
  15. S15 EADS/Airbus completes its aerostructures strategy · EADS/Airbus, Defense Mirror (EADS/Airbus release), 2009-01-07 · accessed 2026-11-01
  16. S16 GKN transfer completes Airbus restructuring, for now · Charles Alcock, Aviation International News, 2009-01-30 · accessed 2026-11-01
  17. S17 EADS reports 2009 results · EADS, AviationNews.eu (source: EADS), 2010-03 · accessed 2026-11-01
  18. S18 From stabilisation to expansion: EADS reports 2010 full year results · EADS, EADS (archived by Airbus), 2011-03 · accessed 2026-11-01