CS-227failure
Drake & Scull International PJSC (DSI), Dubai-listed mechanical, electrical and plumbing (MEP) and engineering contractor
The 2017 Recapitalization Program, as the company named it, and the turnaround efforts that followed it to 2021: a capital reduction, an AED 500m equity injection by Tabarak Investment as strategic investor, a bank debt restructuring expected by the end of 2017, management changes and the closure of non-performing units; it ended in record losses, a share suspension and an application for court restructuring under the UAE bankruptcy law. The later court-supervised plan, the 2024 relisting and the 2024-2025 profits are later fate
- Region
- Middle East
- Country
- United Arab Emirates
- Industry
- Engineering, Construction and EPC
- Functions
- Strategy, Corporate Development & Transformation Office, Finance & FP&A, Risk, Compliance & Internal Audit, Operations & Service Delivery
- Topics
- Cash is trapped and liquidity is tightening; Data cannot be trusted for critical decisions; M&A integration or corporate complexity is destroying value; Service delivery is too slow, unreliable or expensive
- Starting situation
- Stalled or failing (turnaround)
- Period
- 2017–2021
- Last verified
- 5 November 2026
Executive summary
Drake & Scull International, a Dubai contractor for mechanical, electrical and plumbing work, had been losing money since the 2014 oil price fall [C03]. In 2017 it launched a recapitalisation: it cancelled Dh1.7bn of shares to clear past losses, took Dh500m from a new largest shareholder, Tabarak Investment, and set out to restructure its bank debt [C01, C03]. It said the debt deal would be done by the end of 2017 and that performance would normalise in 2018 [C02].
Instead the 2018 loss reached Dh5.09bn, revenue fell from Dh2.6bn to Dh798m and the shares were suspended [C05, C06]. The auditor raised a going-concern warning and could not determine the accuracy of recognised revenue, and the company went through three chief executives in a year [C07]. The bank deal was not completed, and the company sought court restructuring under the bankruptcy law, and the plan creditors approved writes off 90% of its debts [C12, C14].
The case shows a recapitalisation sized before the true scale of losses was known. A strategic investor's equity was spent on a balance sheet whose provisions and receivables had not been tested. The company's relisting in 2024 came only after creditors wrote off more than Dh4bn [C18, C19].
Outcome: failure
The initiative was abandoned, exited or written down, or an official finding called it a failure.
Basis of the outcome
The initiative is the 2017 Recapitalization Program, as the company called it (S08), and the turnaround efforts that followed it until the 2021 court application. Its stated expectations were that debt restructuring would be completed before the end of 2017 and that financial performance would normalise in 2018 (S08). Neither happened. The 2018 net loss was AED 5.09bn against AED 1.4bn in 2017, revenue fell from AED 2.6bn to AED 798m and total assets from AED 6.9bn to AED 1.9bn, mainly because of provisions and unpaid amounts (S02); trading in the shares was suspended from November 2018 (S02, S03); the auditor reported a material uncertainty about the group's ability to continue as a going concern, said revenue on certain contracts had been recognised at values different from the contract values and that it could not determine the accuracy of the year's recognised revenue, and current liabilities exceeded current assets by AED 4.74bn (S03); the company had three chief executives between April 2018 and April 2019 (S03). At the end of 2019 liabilities still exceeded assets by AED 4bn and no bank restructuring proposal had been finalised (S04). The company then moved to formal processes: the Financial Restructuring Committee accepted its request to restructure in May 2020, and in the third quarter of 2021 it applied to the Dubai Courts under the emergency provisions of the bankruptcy law (S05). The plan creditors approved writes off 90% of the debts and converts the rest into mandatory convertible sukuk (S10, S11); a lower court had ordered liquidation before the appeal court approved the plan in 2023 (S06, S11), and AED 4.18bn of debts were written off in 2024 (S07). Later fate, as context only: the shares resumed trading in May 2024 after new capital of more than AED 450m (S07); the 2024 profit came almost entirely from the write-back of liabilities (S13), and 2025 net profit was AED 47.09m, with accumulated losses of AED 1.67bn (S14).
Key figures
| Phase | Figure | Value | When | Verification |
|---|---|---|---|---|
| Before | Shares cancelled to absorb losses | Dh1.7bn | 2017 | press_reported |
| Before | Equity from strategic investor | Dh500m | 2017 | press_reported |
| During | Net loss | Dh5.09bn | 2018 | press_reported |
| During | Chief executives between April 2018 and April 2019 | three | 2019 | press_reported |
| After | Share of debts written off under the plan | 90% | 2023 | press_reported |
| After | Debts written off | Dh4.18bn | 2024 | press_reported |
- press_reported
- A journalist's own reporting.
Practices this case bears on
- SupportsName one accountable sponsor, keep sponsorship stable, and treat a leadership change as a re-baselining event BP-003
- SupportsTie every benefit to the financial statements, bank it before counting it, and keep tracking after the programme ends BP-010
- SupportsAfter a control or conduct failure, fix governance, leadership and incentives before strategy, and keep individual accountability proportionate and separate BP-025
- SupportsScale risk, quality and control functions with the speed and size of the change BP-027
- SupportsRenew the leadership team quickly, choosing leaders from where the business is going BP-029
- SupportsAnnounce only targets the evidence supports, build synergy estimates from shared data, and re-base them openly BP-033
- SupportsSeparate the programme's own effect from tailwinds, shocks and one-off gains before claiming credit BP-035
- SupportsDiligence the target's trajectory and the quality of its revenue, not its snapshot BP-038
- SupportsRe-plan openly when the facts change, rather than defending the old timetable BP-043
- SupportsSecure the cash runway before you need it, and measure liquidity at its worst point BP-044
- SupportsDecide what litigation or a dispute is for, and settle against its full cost and duration BP-067
- SupportsDiagnose the root cause and the gap to the best before choosing the remedy BP-069
- SupportsMake every borrowing, guarantee and related-party exposure visible to the board, and reconcile it independently BP-073
- SupportsUse a formal, supervised restructuring, prepared in advance, when informal rescues have failed BP-075
Sources
- S01 Drake & Scull to cut debts, close subsidiaries in turnaround plan · Manoj Nair, Gulf News, 2019-05-08 · accessed 2026-11-05
- S02 Losses in 2018 climb to Dh5b for Drake and Scull International · not stated, Gulf News, 2019-04-25 · accessed 2026-11-05
- S03 Drake & Scull is yet to come up with turnaround plot · not stated, Gulf News, 2019-04-29 · accessed 2026-11-05
- S04 Drake & Scull reports return to profit and says restructuring is on track · Michael Fahy, The National, 2020-06-09 · accessed 2026-11-05
- S05 Dubai engineering firm Drake & Scull International wins creditors' approval for restructuring plan · Manoj Nair, Gulf News, 2022-03-07 · accessed 2026-11-05
- S06 Auditors raise concerns over Drake & Scull as losses grow · not stated, AGBI (Arabian Gulf Business Insight), 2024-03 · accessed 2026-11-05
- S07 Drake & Scull writes off $1.1bn in debts and completes restructuring requirements · not stated, The National, 2024-06-10 · accessed 2026-11-05
- S08 Drake & Scull losses deepen as restructuring continues · John Everington, The National, 2017-11-15 · accessed 2026-11-05
- S09 Drake & Scull reports $135m loss in Q3 over restructuring · not stated, Arabian Business, 2018-11-14 · accessed 2026-11-05
- S10 Court gives Dubai's Drake & Scull stay of execution · not stated, AGBI (Arabian Gulf Business Insight), 2023-08 · accessed 2026-11-05
- S11 Appeal court green lights Drake & Scull restructure · not stated, AGBI (Arabian Gulf Business Insight), 2023-11 · accessed 2026-11-05
- S12 Drake & Scull International 2021 audited results · not stated, Drake & Scull International, via the Dubai Financial Market disclosure feed, 2022-03-29 · accessed 2026-11-05
- S13 Dubai's Drake and Scull swings to net profit of Dh3.79 billion in the second quarter of 2024 · not stated, Gulf News, 2024-07-29 · accessed 2026-11-05
- S14 Drake & Scull logs lower profits in 2025; accumulated losses hit AED 1.6bn · not stated, Mubasher (Decypha), 2026-03-17 · accessed 2026-11-05
- S15 Drake & Scull to resume trading of its shares on DFM after more than five years · Fareed Rahman, The National, 2024-03-06 · accessed 2026-11-05
- S16 Contractor Drake & Scull files lawsuit claims of $2.8bn · not stated, AGBI (Arabian Gulf Business Insight), 2023-08 · accessed 2026-11-05
Researched and fact-checked knowledgebase · Knowledgebase built 5 November 2026 · Last verified 5 November 2026
Practices, their evidence grades and case summaries are public. Full case studies are available in AXIOM to subscribers and AXIOM Discover participants.