Skip to content

DCT Lexicon · DCT Helix

Attainable step

The largest step the company can take now, one of four (Foundation first, Focused step, Orchestrated multi-strand step, Enterprise step), capped by its weakest critical capability, not by the average.

Drafted for the author's approval from the DCT Helix white paper (Capability sets the attainable step; HX.RULE.WeakestLink, HX.AS.1–4)

In depth

In the method

Before sizing a step, DCT Helix measures where each department stands on 10 dimensions of readiness, scored from 1 to 5 with evidence. Three are critical: leadership alignment, change capability, and technology and data. The rule is strict: the attainable step is capped by the weakest critical capability.

DCT Helix white paper (October 2026), Capability sets the attainable step, verbatim

How to read it

The step is not a target the company picks; it is what its capabilities allow. Raising the weakest critical capability is the only way to raise the step.

Drafted for the author's approval

How AXIOM uses it

AXIOM sets the attainable step by the weakest-critical rule, from the Capability Readiness scores; this is the rule of record. The ANFIS reading beside it shows how firmly the answers support that step and never changes it.

Drafted for the author's approval, from D-009 and D-093

Related: Readiness · Foundation first · Focused step · Orchestrated multi-strand step · Enterprise step · ANFIS (adaptive neuro-fuzzy inference)

HX.RULE.WeakestLink · HX.AS.1 · HX.AS.2 · HX.AS.3 · HX.AS.4 · HX.P.05