Expected value
The average of an outcome over the declared law's futures, estimated by the mean over simulated paths; with curvature it differs from the outcome computed at average inputs.
Drafted for the author's approval from Vol. I, Theorem 8.5 and Section 8.9
In depth
In the book
With curvature, the average of the outcomes differs from the outcome computed at average inputs: for a convex quantity, such as a cost that rises ever faster with volume, the average outcome lies above the plan computed at average inputs (Jensen’s inequality), and for a concave quantity, below it.
Vol. I, Theorem 8.5(ii) (Expected Enterprise Evolution Theorem), verbatim
Executive example
The planned trough is not the average trough. Averaged over paths, each path’s lowest quarter is $384 million, almost $100 million below the plan’s $482 million, because the low point of a path is a concave function of the path and Jensen’s inequality works against the plan (Theorem 8.5(ii)).
Vol. I, Worked Example 8.1, Step 4, verbatim
Common misreading
A common mistake is to present the base case as the expected outcome without checking for curvature.
Vol. I, LOS 8.4, verbatim
How AXIOM uses it
Wherever AXIOM shows an expected value, it is the mean over the simulated paths of the declared law, with its standard error; the plan computed at average inputs is never labelled the expected outcome.
Drafted for the author's approval
In the book: Vol. I, Ch. 8: Stochastic Enterprise Dynamics
Related: Expected value uplift · Monte Carlo simulation · Percentiles (P10, P50, P90) and bands
V1.Thm.8.5 · V1.WE.8.1 · V2.Def.9.1