Locked decision

A plan the board has signed at G4 with its certificates, triggers and the settings that produced it; it is never edited, and changing it needs re-certification and a new G4 signature.

The lock is AXIOM's rule (D-026, D-038: the decision lock stays at G4). It rests on the book's certified decision (Vol. II, Definition 16.3)

In depth

In the book

A program with its certificate chain—a computation the board can check for each piece and for the joint check, with its margin—and its certified region: Volume I’s “all three or none” (Definition 16.3; Theorem 16.3).

Vol. II, Glossary of Key Terms, p. 394 (Certified decision), verbatim

How AXIOM uses it

At G4 the board signs the plan; AXIOM locks it with its certificates, its triggers and the settings that produced it. New data makes a new version beside it, never an edit; changing the plan needs it re-certified and G4 signed again.

Drafted for the author's approval, from D-026 and D-038

Common misreading

A common mistake is to sign an optimized program as if it had room to spare.

Vol. II, LOS 16.4, verbatim

In the book: Vol. II, Ch. 16: Enterprise Applications and Integrated Transformation Case Studies

Related: Trigger (re-certification) · G4 Design certified · Certificate

V2.Def.16.3 · HX.G4