DCT Lexicon · Definitions
Target state
x*
The target or reference state for the current horizon and information. Each re-solve can move it.
The DCT Map: Enterprise Transformation Architecture
In depth
Formal
ℛ(x0) = { Tαm ∘ ⋯ ∘ Tα1(x0) : admissible sequences }
The DCT Map: A_T · Enterprise Transformation Architecture
In brief
The operator family organized into programmes: admissible compositions, transformation pathways, reachability of target states, and the stability of the motion those pathways generate.
The DCT Map: A_T · Enterprise Transformation Architecture
Executive
The transformation steps organized into programmes: which sequences are admissible, which target states can be reached at all, and whether the motion they produce is stable. Reaching a target and holding it are different results, and holding it needs more.
DCT concept registry: the author's executive text (approved 9 October 2026)
Development
A transformation pathway is a word in the operator alphabet, and the architecture is the grammar that says which words are admissible. Reachability then asks whether a target x* lies in ℛ(x0), and controllability asks whether ℛ(x0) covers the feasible set. For linear dynamics these reduce to a rank condition on the Kalman controllability matrix; for nonlinear dynamics to the Lie-algebra rank condition of Chow–Rashevskii, and the honest finding is usually that the reachable set is strictly smaller than the feasible set.
Stability of the pathway is a separate question from reaching the target. A programme can reach x* and fail to hold it, which is why the architecture carries Lyapunov and invariance arguments alongside reachability. The distinction between 'we can get there' and 'we can stay there' is precisely the distinction between reachability and viability, and it is what Chapter 14 turns into a certificate.
The DCT Map: A_T · Enterprise Transformation Architecture
Key points
- Pathways are words in the operator alphabet; the architecture is the grammar of admissible words.
- Reachability: is the target in ℛ(x0)? Controllability: does ℛ(x0) cover the feasible set?
- Rank conditions (Kalman, Chow–Rashevskii) decide reachability; the reachable set is usually strictly smaller than hoped.
- Reaching a target and holding it are different theorems — the second needs invariance, not reachability.
The DCT Map: A_T · Enterprise Transformation Architecture
Canonical sources
- Kalman (1963), 'Mathematical Description of Linear Dynamical Systems'
- Sontag (1998), Mathematical Control Theory
- Isidori (1995), Nonlinear Control Systems
The DCT Map: A_T · Enterprise Transformation Architecture
In the book: Vol. I, Ch. 6: Enterprise Transformation Operators
Related: AT · Enterprise Transformation Architecture
V1.Ch.6


