DCT Lexicon · DCT Helix
Helix gate
The end of a Helix move, where a certificate states what was declared, what was checked, what remains open and who owns it; nothing advances without it.
Drafted for the author's approval from the DCT Helix white paper, Principle 12 (Certify every gate) and The Loop
In depth
In the method
Certify every gate. Nothing advances without a certificate: what was declared, what was checked, what remains open and who owns it.
DCT Helix white paper (October 2026), Principle 12, verbatim
How to read it
There are seven Helix Gates, G1 to G7, one at the end of each move. Each certifies one thing (the baseline, the diagnosis, the step, the design, the banked benefits, the new equilibrium, the renewal decision) and decides whether funding continues.
Drafted for the author's approval
Common misreading
Only the Helix Gates G1–G7 are called gates. The book's Optimization Readiness R1–R4 are checks, and Capability Readiness is a score; neither is a gate.
Drafted for the author's approval, from the vocabulary ruling of 26 October 2026
How AXIOM uses it
AXIOM issues each gate's certificate from declarations and engine results, and shows the gates still ahead on the Decisions & gates tab. The decision lock sits at G4.
Drafted for the author's approval
Related: Loop · Certificate · G1 Baseline certified · G4 Design certified · Optimization Readiness R1–R4
HX.P.12 · HX.G1 · HX.G2 · HX.G3 · HX.G4 · HX.G5 · HX.G6 · HX.G7